This powerpoint presentation begins by providing a brief overview of the Gwinnett County Department of Water Resources Energy Management and Operations (EMHAZOP meetings and constraints;hydraulic analysis;feasibility study and savings review;EMS software design specification; and,SCADA / HMI interface and IT Design. The implementation plan and schedule is presented, along with a review of savings and return on investment. Includes tables, figures.
Product Details
Edition: Vol. - No. Published: 11/01/2009 Number of Pages: 48File Size: 1 file , 3 MB