More info
Full Description
This powerpoint presentation begins by providing a brief overview of Estes Park, Colorado, and two of its water treatment plants (WTPs), GlacierCreek and Mary's Lake. Mary's Lake WTP improvements to meetthe town's objectives included:design flow 4 mgd;meet regulatory requirements (SWTR, LT2ESWTR);minimize wastewater to sewer;minimize cost of improvements;utilize existing building without major expansion; and,currently under construction. The cost of wastewater discharge to sewer is presented, along with comparative industrial wastewater rates insurrounding communities, treatment options considered forminimizing wastewater discharge, 2 stage submerged membranes was the selected treatment, waste streams in the plant, waste streams at 4 mgd plant flow, conservation of space along with water, water reuse in the temporary treatmentsystem, managing temporary waste flows, and approximate project costs. Includes tables. Product Details
Edition: Vol. - No. Published: 11/01/2009 Number of Pages: 22File Size: 1 file , 4.8 MB