Sale! View larger

AWWA ACE70758

New product

AWWA ACE70758 Cost-effective Stage 2 D/DBPR Compliance Options

Conference Proceeding by American Water Works Association, 11/01/2009

Dowbiggin, Bill

More details

$12.00

-50%

$24.00

More info

Full Description

This powerpoint presentation begins by providing a brief overview of Stage 2 TTHM and HAA5 limits. Disinfection byproduct (DBPs) formation is outlined, along with an overview of options to lower DBP concentrations. Conclusions on DBP optimization: select a conservative goal; evaluate existing conditions; optimize existing facilities for low costcompliance; determine if probability of compliance isacceptable or if improvements are needed usinga safety factor; evaluate options to meet targets throughdesktop, bench and/or pilot tests; and, perform cost-effective analysis of alternativesand implement the solutions. Includes table, figures.

Product Details

Edition: Vol. - No. Published: 11/01/2009 Number of Pages: 13File Size: 1 file , 1.3 MB