Sale! View larger

AWWA ACE69003

New product

AWWA ACE69003 LT2ESWTR Compliance for the Fallbrook PUD Red Mountain Reservoir

Conference Proceeding by American Water Works Association, 11/01/2008

Loveland, Jon; Cotton, Christine; Bebee, Jack; Kuhnel, Ben; Alspach, Brent; Page, Mike; Jackson, Joe; Cavender, Jason

More details

$12.00

-50%

$24.00

More info

Full Description

This powerpoint presentation begins by presenting a brief overview of the LT2ESWTR as a regulatory driver: concerned with uncoveredfinished water reservoir provisions;separate from "Toolbox";"Inactivation and/or Removal"; and,enabling technology - UV. Process options are presented, along withphysical setting,system hydraulics,water quality,equipment pre-selection, andfacility design. Presentation conclusions indicate the following:UV/Cl2/NH2Cl system received conditionalapproval;health official(s) input attechnology/approach screening, validationworkshop, 30%, 60%, and 90% design;system sized for future flow and waterquality challenges;successful pre-selection;project going to bid in late-2008; and,construction and start-up in 2009. Includes tables, figures.

Product Details

Edition: Vol. - No. Published: 11/01/2008 Number of Pages: 26File Size: 1 file , 2.2 MB