More info
Full Description
This powerpoint presentation provides a brief overview of the Cleveland Water Division (CWD), and the problem it was having with: low Clsub2/sub residuals in a portion of thetransmission mains; suspected biofilm issues;distribution system model not suitable forthis arrangement, water age unknown for this small area; and, low flow demands. The approach used included: fluoride tracer study;shut off F- feed at Crown and Morgan Water Treatment Plants (WTPs),maintain at Baldwin WTP;sample strategically;control the variables;draw conclusions from data; and,pipe section sampling considered, butshelved due to cost. Conclusions were that: Independence Pump Station will not put waterinto Brecksville system if the bleeds are open;with bleeders open, 3rd high pushes water backtowards Independence; water from Independence then flows towards Parma;Chlorine Residuals will not increase in Brecksvillesystem as long as bleeders are open as they were inthe study;chlorine residual in 3rd high service near Brecksville islow;a biofilm is quite likely since there has been lowchlorine in system for some time;open or closed, bleeders will cause water quality issues; and,CWD will expend capital dollars to address. Includes figures. Product Details
Edition: Vol. - No. Published: 11/01/2007 Number of Pages: 22File Size: 1 file , 2.4 MB