This slide presentation outlines information on operational challenges and full-scale testing at the Pulgas Dechloramination Facility, part of the San Francisco Public Utilities Commission Regional System. Topics covered include: background of the project;dechloramination;design intent including site evaluation;operationalchallenges that included hydraulics, pH control, dechlorination and chlorinated "spikes";full-scale testingresults;future projects; and,lessons learned.
Product Details
Edition: Vol. - No. Published: 06/17/2005 Number of Pages: 33File Size: 1 file , 2.7 MB