More info
Full Description
The Metropolitan Sewer District of Greater Cincinnati hasimplemented a significant upgrade to its Industrial Pretreatment Information ManagementSystem (PIMS). This Oracle based system is both comprehensive for pretreatment activities andable to interact with the District's Laboratory Information Management System (LIMS) and enterprise applications such as Geographic Information System (GIS).This paper describes: the District's journey from a paper-based systemto the current Oracle based system; the installation phase of data migration and configuration; and,the start-up phase. It demonstrates several points that include: the work order scheduling of monitoring; reportsand correspondence; and, the LIMS interface and the compliance evaluation of laboratory results.It forecasts several points that include: the positive impact of implementing workflow using the systems "Task-on-status-change"feature; and, the integration of enterprise applications.The District's pretreatment program began with a consultant's study in 1981 using amainframe database. After Ohio US Environmental Protection Agency (USEPA) approval in 1986, the District began tracking industrialmonitoring, permitting and compliance on paper. In 1988, a single IBM 286 PC using a Lotus123 spreadsheet was purchased and used for this purpose. By 1990, the USEPA's free databasesoftware PCME was used on a Token-ring Novell network. In 1993, an extensive and expensivecustom-built oracle based PIMS was rolled out. However, spreadsheets persisted and by 1997 afunctional substitute was constructed in MS Access 2.0 by the users. In 2001, the Districtpurchased the PACS 2000 PIMS system from enfoTech and Consulting, Inc. of New Jersey.Multiple silos of data existed in the District's pretreatment program and installationrequired cooperation of the data owners, cleansing of bad data, enhancing of poor data, andmapping the resulting data set for migration into the new database. Many sets of configurationdata were needed to fill in the drop down lists (pick lists) in the PACS 2000 system. Referencetasks, specific to the District, were needed for the work order based monitoring schedule. Startuppresented challenges both to the users and designers with a heavy emphasis on screennavigation. Product Details
Edition: Vol. - No. Published: 04/27/2003 Number of Pages: 10File Size: 1 file , 320 KB