More info
Full Description
This paper presents regulatory, technologic, and economic information for considering low -pressure membranes for therehabilitation of an existing conventional water treatment plant (WTP). The paper presents desktop analysis, pilottesting and design performed for the rehabilitation of the WTP of the City of Lake Forest (IL).The City of Lake Forest WTP is a 12 mgd conventional treatment process using Lake Michigan as raw water. TheCity of Lake Forest had concerns about the ability of the WTP to meet existing and future water quality standards atits design capacity of 18 mgd. In addition, physical limitations prevented the operation of the plant at its designcapacity. Furthermore, aesthetic constraints limited the expansion of the existing building. Thus, the City of LakeForest decided to proceed with the evaluation of a low-pressure membrane alternative.The evaluation process was divided into three distinct phases.Phase 1 (desktop analysis) allowed the City of Lake Forest to select three low-pressure membrane suppliers amongthe seven manufacturers that had been invited to bid. The main criteria were matching the treatment and operationgoals of the WTP and verify that plant layout and construction costs were acceptable to the City.Phase 2 (short term side by side pilot testing) allowed the City of Lake Forest to assess design flux, chemicalcleaning interval, and powdered activated carbon (PAC) efficiency for the three pre-selected manufacturers.Phase 3 concluded the evaluation process with the selection of the membrane system based on a present worthanalysis of the complete facility.As a result of the evaluation process, the City of Lake Forest hired Carollo Engineers to follow up a twelve-monthpilot testing required by the Illinois Environmental Protection Agency (IEPA) and to design the new facility. Thedesign takes into account a final plant capacity of 18 mgd. A cellulose acetate membrane with a nine-monthdemonstrated dead-end flux of 74 gfd @ 20C is used. The minimum chemical cleaning interval will be every threemonths. The low-pressure membrane process occupies one third of the initial conventional treatment footprint. TheCity of Lake Forest awarded the construction contract to the General Contractor by July 19th, 2002. Constructioncompletion is scheduled by August 2004. Includes 3 references, tables, figures. Product Details
Edition: Vol. - No. Published: 03/05/2003 Number of Pages: 11File Size: 1 file , 1.2 MB